1.Lack of performance
standards ~ goal
2.Lack of reliable
design standards ~ correlated to desired goal
3.Economic pressure
to design to minimum prescribed standards
4.Structural
engineers do not control the overall design process
5.Lack of incentives
towards PBEE
6.
6.