CICC Meeting – January 27, 2004 – Washington, DC
Project Information Portal – History
Promising
Less
Likely
Not
Viable
5b Single COTS with moderate customization (non-core) by non-OEM Supplier/Integrator
5d Multiple COTS with minimal/moderate (non-core) customization
2b Lotus Notes 4.6 – R5
3 Upgrade/Extend current enterprise project information system
(Utilize COTS web-based front end to IRIS/PMT)
5a Single COTS with minimal customization (“out of the box”)
5c Single COTS with extensive (including core) customization by OEM
4 Design and Build Custom GSA System (would replace PMT and possibly IRIS)
7 EIP, Enterprise Information Portal
2c Documentum
8 Outsource information system (data collection and reporting)
6 ERP, Enterprise Resource Planning
2a MS Office/ Project 97- 2000
1 Do Nothing/Status Quo