5b Single COTS with
moderate customization (non-core) by non-OEM Supplier/Integrator
5d Multiple COTS with
minimal/moderate (non-core) customization
2b Lotus Notes 4.6 –
R5
3 Upgrade/Extend
current enterprise project information system
(Utilize COTS web-based
front end to IRIS/PMT)
5a Single COTS with
minimal customization (“out of the box”)
5c Single COTS with
extensive (including core) customization by OEM
4 Design and Build
Custom GSA System (would replace PMT and possibly IRIS)
7 EIP, Enterprise
Information Portal
2c
Documentum
8 Outsource information
system (data collection and reporting)
6 ERP, Enterprise
Resource Planning
2a MS Office/ Project
97- 2000
1 Do Nothing/Status Quo